antmanb, The point I was trying to make with the trick list is that I&B completely redid their SP arrangement between 4C's 1/23 to 1/29 and skating on 2/11. They didn't just plug elements into the spaces left when other elements were taken out. That's about 2 week old choreo. Not surprising that it's a bit bare at this point, but they need to do better. I would have had them about 4th, ahead of S&Z and Pang&tong.



Bookmarks