- Joined
- Jun 21, 2003
skatinginbc said:A lazy method is simply dividing the current base mark by 10, so we have 1.8 (18.10/10) to 8.2 (81.54/10).
Equoivalently, keep the base values the same and divide the E values by 10. So E values would be .1, .2, etc., instead of 1, 2, etc.
That way we could interpret an E value of .8, say, in the natural way. This skater got 80% of the maximum possible that can be earned for perfect execution of an element of this difficulty.