- Joined
- Oct 22, 2005
If it is one person's job to verify the step sequences and another person's job to verify jumps (edges UR's etc), then you don't have any back and forth (except with the Controller and that happens now anyway).
Typically, the features are broken up for a step sequence between the members of the tech panel. One looks for 2 of the 4 possible features and the others each look for one and report in as "yes", "no", or "review"