At the behest of NISA, TEPCO has assembled what they characterize as a vast amount of data about the earthquake as experienced at Fukushima Daiichi.
http://www.tepco.co.jp/en/press/corp-com/release/11081811-e.html
Translation of this material into English will be forthcoming.
TEPCO 4:00 PM Status for August 18th
http://www.tepco.co.jp/en/press/corp-com/release/11081811-e.html
Translation of this material into English will be forthcoming.
TEPCO 4:00 PM Status for August 18th
At 7:38 am on August 18, we switched water injection line to the reactor from the line which is using a motor driven pump powered by the off-site transmission line to the line which is using a motor driven pump powered by emergency diesel generator. At 12:20 pm on the same day, we installed flow regulating valve to the pipes of water injection line and we switched water injection line to original line. At 12:27 pm on the same day, we adjusted the rate of injecting water to the reactor at approx. 8 m3/h.
- At 10:00 am on August 18, we restarted the transferring of accumulated water at the underground of Unit 6 turbine building to temporally tank.
- At 2:30 pm on August 18, we confirmed the instrument reading of transportable monitoring post that was measuring dose rate of main gate of the power station became unreadable. We are currently investigating the situation on the ground.
- At 8:50 am on August 17, 2011, we transferred accumulated water from the miscellaneous solid waste volume reduction treatment building (the high temperature incinerator building) to the process main building at the centralized radiation waste treatment facility. At 5:25 pm on the same day, we finished the transfer.
-At 7:58 pm on August 17, as a countermeasure against slight water leakage from the primary hose of the alternative cooling apparatus for the spent fuel pool of Unit 4, we stopped the alternative cooling apparatus in order to exchange the hose. -In the Centralized Radiation Waste Treatment Facility at 8:50 am on August 17, we started transferring water from Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building) to Process Main Building.